Trilobite

November 26, 2004

112011034816855582

Filed under: Uncategorized — michael @ 12:00 am

The finishing touches were put on the house this week. The carpets were put in. The closet shelves and deck railing were built. The pump for the jacuzzi jets was installed. So were the central vacuum outlets, but there won’t be any vacuum pump for now. And finally, the refrigerator was brought in.

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment


Warning: Undefined variable $user_ID in /home/public/trilobite.floatingeye.net/wp-content/themes/michael/comments.php on line 37

You must be logged in to post a comment.

Powered by WordPress