Trilobite

October 19, 2004

110109811617102107

Filed under: Uncategorized — celine @ 11:24 pm

HOUSE DEVELOPMENTS:
1) Outside: front on Tuesday morning, front after work (no more tarp and scaffold), light by garage side door, porch spotlights getting installed, motion sensor light installed in back.
2) Inside: preparation of entrance for tiling, guest room, hallway, kitchen cabinets on stilts (until flooring done), outlet, preparation for the master bathroom, guest bathroom spotlights, guest bathroom main light and vent.

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment


Warning: Undefined variable $user_ID in /home/public/trilobite.floatingeye.net/wp-content/themes/michael/comments.php on line 37

You must be logged in to post a comment.

Powered by WordPress