Trilobite

June 3, 2004

108631458249467005

Filed under: Uncategorized — michael @ 9:40 pm

I returned to the house later in the day yesterday and the driveway had been filled back in. The guy who is always there (I should really find out his name) was spreading gravel around with the tractor. After he left I went down and checked out the pipes. Copper for water and PVC for sewage. There is also a new curb stop for the water connection.

Today the foundation walls were started. I’m impressed with the way the corners line up so well with the orange dots on the foundation. More photos: front door, pipes again, support structure.

June 2, 2004

108619291135431888

Filed under: Uncategorized — michael @ 12:08 pm

The temporary driveway at the house has been dug up to lay down a big pipe. It must be for either the water or the sewage. Or maybe there will be several smaller pipes inside the big one.

One member of the construction crew said he remembered playing around here when he was a child and asked if there used to be a house on this lot.

« Previous Page

Powered by WordPress