108631458249467005
I returned to the house later in the day yesterday and the driveway had been filled back in. The guy who is always there (I should really find out his name) was spreading gravel around with the tractor. After he left I went down and checked out the pipes. Copper for water and PVC for sewage. There is also a new curb stop for the water connection.
Today the foundation walls were started. I’m impressed with the way the corners line up so well with the orange dots on the foundation. More photos: front door, pipes again, support structure.
