Trilobite

June 3, 2004

108631458249467005

Filed under: Uncategorized — michael @ 9:40 pm

I returned to the house later in the day yesterday and the driveway had been filled back in. The guy who is always there (I should really find out his name) was spreading gravel around with the tractor. After he left I went down and checked out the pipes. Copper for water and PVC for sewage. There is also a new curb stop for the water connection.

Today the foundation walls were started. I’m impressed with the way the corners line up so well with the orange dots on the foundation. More photos: front door, pipes again, support structure.

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment


Warning: Undefined variable $user_ID in /home/public/trilobite.floatingeye.net/wp-content/themes/michael/comments.php on line 37

You must be logged in to post a comment.

Powered by WordPress